1st Fix

Work undertaken: Pipe Work


Universal Square

Work undertaken:
New male, female and disabled toilets in Manchester along with 2 new kitchen areas with all new pipework fitted to our very high standard.


Damo

Work undertaken:
New bathroom complete re-fit including: Floor, Walls, Ceiling, Rip out of old sanitary, Full new bathroom with new pipework and waste throughout, Designer radiators, Feature bath, sink and toilet, Shower and surround built and the customer was very happy with all aspects especially the finish.


St Marys
Client: ISG, Sustainability & NHS

Work undertaken:
Full new htg system which supplied two floors and three air handling units. On each floor was approx 26 radiators and 12 high level convectors. New toilets, shower areas, sinks in doctors rooms etc was also fitted on both floors to a very high spec. The work was completed on time and again to a very high standard, not one single snag was allocated.


Media City UK
Client: Sustainabilty & BBC UK

Work undertaken:
Back of house works for all the actors changing rooms, auditioning theatres and stages. Work was carried out over a 14 month period working closely with the BBC and how they wanted every room detail set out. Security big issue again no snags. All work was completed to a high standard.



 

Maccescfield Town
Client: Cheshire Council

Work undertaken:
New htg through out the old building, complete with toilets etc all work similar to ones above
Add wording about heritage etc keeping all features disabled toilets on each project, FCU supplied and fitted worked closely on the feature side   toilets to a very high standard.



 

Hale
Client: Private Resident

Work undertaken:
Job undertaken before Christmas in Bramhall. Two bathrooms and large en suite complete with valiant 200 litre cylinder and 35kw valiant condensing boiler and 19 radiators. Mrs Patrick “I am absolutely over the moon with the efficiency, standard and workmanship of all the plumbers who worked on our house from AGA”